Our Standard Operative Approach

01.png
The ASE technical team  through a visit to the plant and based on the inputs of the local technical staff would collects the information necessary for monitoring and control of sensitive areas.
PRELIMINARY%20ANALYSIS_edited.png
PROPOSAL_edited.png
The acceptance of our Technical-Financial Proposal allows the ASE ENGINEERING design team to elaborate the Final Installation System Plan (FISP), necessary for the installation team and the production and assembly team.
02.png
03.png

Our Final Installation System Plan allows the designated team (ASE or others) to access the executive that provides all the indications for a correct installation of the components foreseen in the project .

FISP_edited.png
INSTALLATION_edited.png

During the installation phase ASE provides supervision of the works to verify the regularity of the execution of the works according to the FISP.

04.png
GO-LIVE
GOLIVE_edited.png

ASE allows the calibration and parameterization of components in order to facilitate the Go-Live of the system, also providing support for the following months in order to verify the accuracy of the data and the correct functioning of the system.